Upcoming CCB Project

We are currently in the process of getting 24 high capacity electric ATEX blowers ready for an upcoming job at Coast Center Base at Ågotnes Yard outside Bergen (CCB). Planned startup is at the 21th of January.

24 habitats ranging in size from 16m3 upwards to 64m3 plus, will be built and operated simultaneously. The habitats will all be operational for an extended period of time, while the hot work which is extension of the legs on a jack-up rig, is being performed.